Patio Laying (20m2) — fixed prices

Twenty square metres of porcelain paving laid on a full mortar bed over a compacted sub-base, with joints pointed and the area cleaned down. A fixed price covering excavation, base, laying and waste removal.

Typical UK fixed cost £4200

Patio Laying (20m2) carried out by a UK building & renovation company

Fixed prices for patio laying (20m2)

No company has published a fixed price for this job yet.

Do this work? Be the first building & renovation company listed for it.

List your fixed price

What's usually included

  • Excavation and removal of spoil
  • Compacted MOT type 1 sub-base
  • Porcelain slabs laid on a full wet mortar bed with primer
  • Pointing with brush-in jointing compound
  • Site clean and waste disposal

About building & renovation on Fixed Costs

Builders publishing fixed prices for clearly defined jobs — knock-throughs, garage conversions, patios and extensions.

See all building & renovation fixed prices

Related fixed-price jobs

Patio Laying (20m2) — your questions answered

How long does a 20 square metre patio take?
Typically four to six working days including excavation, base preparation, laying and pointing.
Is porcelain better than natural stone?
Porcelain is denser, less porous and stays cleaner, so it is easier to maintain. Natural stone is warmer in appearance and more forgiving of small level differences.
Do I need planning permission for a patio?
Not usually for a domestic patio, but drainage matters — new hard surfaces should drain to a permeable area rather than straight into the sewer.
Does the price include the slabs?
Each listing states this. Many companies fix the labour and base and let you choose the paving, since slab prices vary widely.